|






Document Types
 |
Link
to document |
 |
Adobe
Acrobat PDF (see below) |
|
 |
Excel
Spreadsheet file |
 |
PowerPoint
Presentation (online) |
 |
Word
file |
 |
Link
to page containing document |
|
|
 |
Many
documents are stored as Adobe Acrobat® PDF files. This
file type ensures that what you see is the same as the printed
version. PDF files can be viewed using the Adobe Acrobat®
Reader, which is often already installed on your computer. If
you do not have the Acrobat® Reader, you may download it for
free from the Adobe website by clicking the button on the
left.
Depending
on your system, your screen may not change while the file is
loading. Click the "Back" button on your
browser to return to this screen.
|
|
|
 |
|
 |
|
|
Newsletters
The
following provides links to reference and General Plan Update
documents.
|
Newsletters |
 |
Newsletter
#1
Defining the Future
Provides a basic overview
of the General Plan program and information on how to
stay involved in the preparation of the General Plan. |
 |
Fact Sheet
This Fact
Sheet provides a look at some interesting facts and
statistics about the City of Ridgecrest. |
|
|
 |
|
 |
|
 |
|
 |
|
|
Documents
/ Reports
|
Planning Commission Hearing
(posted: October 2009)
Materials |
|
|
 |
Proposed Land Use Diagram |
1.1 Mb |
 |
Staff Report for 10/20/2009 Hearing |
171 K |
|
|
|
|
|
Draft Findings
(posted: October 2009)
Statement of Overriding Considerations |
|
As required by CEQA, the City has made
specific findings regarding the
environmental effects of the project. These
findings constitute the City Council’s best
efforts to set forth the evidentiary and
policy bases for its decision to approve the
project in a manner consistent with the
requirements of CEQA. These findings, in
other words, are not merely informational,
but rather constitute a binding set of
obligations that come into effect with the
City Council’s approval of the proposed
project.
|
 |
Draft Findings and Statement of Overriding
Considerations |
171 K |
|
|
|
|
|
Final EIR
(posted: September 2009) |
|
Since the City of Ridgecrest’s (City’s)
proposed Ridgecrest 2030 General Plan Update
(General Plan or Proposed Project) and draft
Environment Impact Report (EIR) were
published (May 19, 2009), the City received
written comments from public agencies,
organizations, and individuals concerning
these documents and the recommendations and
findings they contain.
The purpose of this final EIR
is twofold. First, this document provides
copies of the comment letters made on the
Proposed Project and EIR and provides
written responses to all environmental
issues raised in these comments on the Draft
EIR (see Public Resources Code, Section
21091(d)(2)(B); CEQA Guidelines, Section
15088(c)). Second, this document is designed
to function as the Final EIR for the
Proposed Project, and as such has been
designed to meet the content requirements of
a final program EIR as specified in the
California Environmental Quality Act (CEQA).
(See Public Resources Code, Section 21000 et
seq. and the CEQA Guidelines [California
Code of Regulations, title 14, Section 15000
et seq.]
The information provided in this document
will be presented to the Ridgecrest City
Council and will be used as part of their
review, consideration, and approval of the
Proposed Project.
|
 |
Final EIR |
6.2 Mb |
|
|
|
|
|
Notice of Preparation
(posted: November 2008) |
|
A Notice of Preparation (NOP)
of an environmental impact report (EIR) on
the Ridgecrest 2030 General Plan was filed
with the
State of California Clearinghouse on
November 26, 2008. The NOP and
associated Notice of Completion &
Environmental Document Transmittal (NOC)
were filed with the State of
California Clearinghouse on November 26,
2008. This document transmitted the NOP for
the Ridgecrest 2030 General Plan Update EIR
and started the public review of these
documents. Comments on the NOP are due
to the City by December 30, 2008. See
the NOP for further information.
The purpose of the NOP is to provide a
project description, location, alternatives
being assessed, and the scope of the
environmental assessment. Since an EIR will
be prepared, the City is not required to
complete an initial study. However, to
assist agencies and the public in
understanding what will be covered in the
EIR, the attached materials contain the
typical information covered by an initial
study checklist as specified in Appendix G
of the California Environmental Quality Act
Guidelines.
|
 |
Notice of Preparation |
3.5 Mb |
 |
Notice of Completion & Environmental
Document Transmittal |
227 K |
|
|
|
|
|
General Plan
(posted: October 2008) |
|
Public Draft
The General Plan
contains the goals and policies that will guide future
decisions within the City. This document also
identifies a full set of implementation measures that
will ensure the goals and policies in the General Plan
are carried out.
This version
was prepared based on comments received from the General Plan Advisory
Committee (GPAC), the public, and City staff.
|
 |
General Plan |
10.7 Mb |
 |
General Plan Land Use Diagram |
1.1 Mb |
|
|
|
|
|
Policy
Directions / Choices
(posted: March 2008) |
|
Using a question / response format, this report
presents to the City Council and Planning Commission
the policy directions that will be used to craft the
General Plan. At this time, we are looking to the
City Council and Planning Commission to confirm,
modify, or add to the policy directions presented.
|
 |
Policy
Directions / Choices Report |
2.4 Mb |
|
|
 |
|
 |
|
 |
|
 |
|
|
City Council / Planning Commission
Agendas and minutes materials from City Council and Planning Commission meetings
will be posted here (as available).
|
Planning Commission
Hearing
October
20, 2009 |
 |
Agenda |
 |
Staff Report |
|
Joint City
Council /
Planning Commission Workshop
April
2, 2008 |
 |
Agenda |
 |
View
PowerPoint Presentation |
 |
Download
Print Version of PowerPoint Presentation |
 |
Policy
Directions / Choices Report |
|
|
 |
|
 |
|
 |
|
 |
|
|
Advisory Committees
Agendas
and
minutes from General Plan Advisory Committee (GPAC) will be posted here (as available).
|
GPAC Workshop #13
March
25, 2008 |
 |
Agenda |
|
GPAC Workshop #12
February
26, 2008 |
 |
Minutes |
 |
Agenda |
|
GPAC Workshop #11
January 22, 2008 |
 |
Minutes |
 |
Agenda |
 |
GPAC
Presentation
(PowerPoint Presentation) |
 |
Map 4
Available Land (Update) |
 |
Map 5
Available Land (Update) |
 |
Map 7
Alternative A (Update) |
 |
Map 8
Alternative B |
 |
Map 9
Parkways and Parks |
|
GPAC Workshop #10
December 4, 2007 |
 |
Minutes |
 |
Agenda |
 |
Meeting
Overview |
 |
Map 1
Existing Land Use |
 |
Map 2
Existing Zoning |
 |
Map 3
Existing General Plan |
 |
Map 4
Available Land |
 |
Map 5
Available Land (Aerial) |
 |
Map 6
Proposed Residential Development |
 |
Map 7
Alternative A |
|
GPAC Workshop #9
October
23, 2007 |
 |
Minutes |
 |
Agenda |
|
GPAC Workshop #8
September 25, 2007 |
 |
Agenda |
 |
Minutes |
 |
Land Use
Concepts (5.3Mb) |
|
GPAC Workshop #7
August 29, 2007 |
 |
Agenda |
 |
Minutes |
|
GPAC Workshop #6
August 28, 2007 |
 |
Agenda |
 |
Minutes |
|
GPAC Workshop #5
July
24, 2007 |
 |
Agenda |
 |
Minutes |
|
GPAC Workshop #4
June
26, 2007 |
 |
Agenda |
 |
Minutes |
|
GPAC Workshop #3
May
22, 2007 |
 |
Agenda |
 |
Minutes |
|
GPAC Workshop #2
April
24, 2007 |
 |
Agenda |
 |
Minutes |
|
GPAC Workshop #1
March 27, 2007 |
 |
Agenda |
 |
Minutes |
|
|
 |
|
 |
|
|